Thursday, April 17, 2014

Thursday, April 17

So much to do, so much to think about.  I must have been out of mind to take this on.  Hopefully I will look back later and laugh  about it all.  Spent a good deal of time this week getting the countertops and the floor laid out.  Went into Home Depot today to finalize the order and the bill.  They are telling me it will be about 5 weeks total to get everything completed.  I am both excited and frustrated.  Wish we could get done quicker.

 I called the plumber today.  The stool upstairs is not working properly and despite calling attention to it prior to close there is an outside faucet that is spewing water.    Guessnee  to think of it all as part of the adventure.  They will be here Monday.

Grandson number 4 is here tonight moving boxes.  Have been told need to get as much room as possible available for the install that is coming up.  There are 9 pallets of product to bring in.  We are going to use the two bedrooms upstairs that are not affected to store boxes of everything that can't be put away until after we get the new floor and counters in place.

Tomorrow Grandson number 1 will be here as well as grandson number 4 returning.  Hopefully we will make good progress tomorrow on moving things around.

I called a lawn guy today and had the grass cut and the weeds cut down.  He will be back in two weeks.  Could hardly speak english but did a good job.

Sunday I will be going to see Cowboy again.  More later.
 

No comments:

Post a Comment